Y.W.Yan1)
,
B.K.Wei2)
,
Z.Y.Fu1)
,
H.T.Lin2) and R.Z.Yuan1) 1) State Key Lab .of Advanced Technologyfor Materials Synthesisand Processing
,
Wuhan University of Technol ogy
,
Wuhan 430070
,
China 2) Institute of Materials
,
Huazhong University of Science and Technology
,
Wuhan 430074
,
China
金属学报(英文版)
Under aircondition,theinsitu TiCP/ Fecompositeshavebeen fabricated by a reactivecast ing route usingtheinexpensiveraw materials. The microstructuresofthecompositehavebeen studied by X ray diffraction,image analyzer and analyticalelectron microscopy. The me chanicalpropertiesand abrasive wearresistanceofboththeas castcompositeandthequenched composite havebeen measured. Theresultsshow thattheinsitu TiCparticles with a average sizeof 4 51μm exhibit a homogenous distribution inthe matrix, and an excellentinterface bonding between the particle and the matrix is achieved. As above microstructure features, thecomposite,especiallythequenched composite, hashigher mechanicalpropertiesand betterwear resistance,compared with high Cr whitecastiron.
关键词:
TiCP/ Fecomposite
,
null
,
null
,
null
,
null
ZHANG Shourong
钢铁研究学报(英文版)
One of the problems encountered in 60′s to 80′s of 20th century in China′s steel industry was short life of blast furnace shaft as well as the excessive erosion of blast furnace hearth. A series of research work was carried out in order to extend blast furnace campaign life. The concept of research and development was integrated in the construction of BF (blast furnace) No5 at WISCO (Wuhan Iron and Steel Corporation), and in October, 1991, the BF No5 was blown in. The blast furnace has worked smoothly for more than 15 years without any medium repair even guniting. It is expected that the campaign life of BF No5 would be longer than 16 years with a production over 11 000 t per unit inner volume (m3). A new blast furnace with an inner volume of 3 400 m3 is under construction, and is designed with a campaign life of 20 years without any medium repair. The campaign life of blast furnaces in China has been extended in recent years.
关键词:
blast furnace;campaign life;erosion