SONG Chun-yue
,
HU Kai-lin
,
LI Ping
钢铁研究学报(英文版)
A new scheduling model for the bulk ore blending process in iron-making industry is presented, by converting the process into an assembly flow shop scheduling problem with sequence-depended setup time and limited intermediate buffer, and it facilitates the scheduling optimization for this process. To find out the optimal solution of the scheduling problem, an improved genetic algorithm hybridized with problem knowledge-based heuristics is also proposed, which provides high-quality initial solutions and fast searching speed. The efficiency of the algorithm is verified by the computational experiments.
关键词:
bulk ore blending
,
assembly flow shop
,
sequence-depended setup time
,
limited intermediate buffer
,
genetic algorithm
Physics of Life Reviews
Commentaries by Philip W.T. Pong, Nongyue He, S.D. Liang, Tao Song, Yuri Gaididei and Sergey Volkov and Alexander Y. Grosberg on my review article (Pang, 2011 [1]) are answered. The validity of Davydov's mechanism of bio-energy transport, the completeness of theory, outstanding problems, the normalization and validity of wave function of the system in Pang' model as well as other related problems are elucidated in detail. (C) 2011 Elsevier B.V. All rights reserved.
关键词:
biological temperature;3 channels;soliton;model
李莉
,
李庆芬
,
郑磊
,
徐庭栋
,
杜善义
钢铁研究学报
以工业用12Cr1MoV钢为研究对象,通过俄歇电子能谱分析方法(AES),对磷在恒温过程中的非平衡晶界偏聚浓度进行了测定.获得的磷在钢中的非平衡晶界偏聚动力学曲线直接验证了非平衡晶界偏聚动力学理论中的Xu-Song模型.
关键词:
晶界偏聚
,
临界时间
,
扩散
,
钢