欢迎登录材料期刊网

材料期刊网

高级检索

Considering the multivariable,strong-coupled,and nonlinear features of tandem cold rolling mill,a mathematical model of multi-objective optimization was built to facilitate the design of new systems aiming at equating the relative load,preventing slip,and obtaining best shape.BP (back propagation) neural network based on LevenbergMarquardt algorithm was used for predicting the rolling force.The multi-objective fuzzy theory and method were introduced during the optimization.With an example of 1 370 mm tandem cold rolling mill,the rolling schedule of the common rolling,the single-objective optimization design,and the multi-objective fuzzy optimization design were compared with each other.The results generated from the case study showed that the proposed approach could significantly decreased the values of three objective functions simultaneously and the performance of the optimal rolling schedule was satisfactory and promising.Moreover,the capability and usefulness of fuzzy application in tandem cold rolling schedule were clearly demonstrated.

参考文献

[1] Wang D D;Tieu A K;de Boer F G et al.Toward a Heuristic Optimum Design of Rolling Schedule for Tandem Cold Rolling Mills[J].Engineering Applications of Artificial Intelligence,2000,13(04):397.
[2] LIU Zhan-ying.Rolling Distortion Schedule Optimization Design[M].北京:冶金工业出版社,1996
[3] Purshouse, R.C.;Fleming, P.J. .On the Evolutionary Optimization of Many Conflicting Objectives[J].IEEE transactions on evolutionary computation,2007(6):770-784.
[4] HU Bao-qing.The Basis of Fuzzy Theory[M].武汉:武汉大学出版社,2004
[5] Deb K;Thiele L;Laumanns M.Scalable Multi-Objective Optimization Test Problems[A].Piscataway(NJ):IEEE,2002:825.
[6] YANG Jimg-ming;CHE Hai-jun;DOU Fu-ping et al.Gennetic Algorithm-Based Optimization Used in Rolling Schedule[J].Journal of Iron and Steel Research International,2008,15(02):18.
[7] Oduguwa Victor;Roy Rajkumar;Farrugia Didier .Fuzzy MultiObjective Optimization Approach for Rod Shape Design in Long Product Rolling[J].Lecture Notes in Artificial Intelligence,2003,27(15):636.
[8] Bath S K;Dhillon J S .Fuzzy Satisfying Stochastic Multi-Objective Generation Scheduling by Weightage Pattern Search Methods[J].Electric Power Systems Research,2004,69(02):311.
[9] Alejandra Duenas;Dobrila Petrovic .Multi-objective genetic algorithm for single machine scheduling problem under fuzziness[J].Fuzzy Optimization and Decision Making: A Journal of Modeling and Computation Under Uncertainty,2008(1):87-104.
[10] ZHENG Lu;GU Xing-sheng.Fuzzy Production Scheduling in No-Wait Flow Shop to Minimize the Makespan With E/T Constraints Using SA[A].Piscatoway:IEEE,2004:2909.
[11] 杨景明,王崇鹏,刘畅.基于罚函数法的冷连轧轧制规程优化设计[J].钢铁研究学报,2008(09):54-57.
[12] 白振华,连家创,王骏飞.冷连轧机以预防打滑为目标的压下规程优化研究[J].钢铁,2003(10):35-38.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%