在分析加权平均法、模糊综合评价法、TOPSIS法和灰色关联度评价法各自优缺点的基础之上,针对单一评价方法的不足,运用序号总和理论与众数理论,结合上述4种多指标评价方法,建立工程选材组合评价模式.以低温存储罐材料的选择为例,从功能性和经济性角度出发,选择了8种评价指标,由层次分析法得到10种候选材料的评价指标的权重,运用上述组合评价模式进行组合评价.结果表明,全硬态301型不锈钢是最佳的低温存储罐材料,与客现实际相符,且组合评价模式所得排序结果优于单一评价方法.在工程设计中使用组合评价模式进行选材评价,有助于弥补单一评价法的缺陷,是工程选材决策的有力工具.
参考文献
[1] | Ljungberg Lennart Y;Edwards Kevin L .Design,materials selection and marketing of successful products[J].Materials & Design,2003,24:519. |
[2] | Matos M J;Simplcio M H.Innovation and sustainability in mechanical design through materials selection[J].Materials & Design,2006:27-74. |
[3] | Wu TieeJian;Sepuiveda Alfred .The weighted average information criterion for order selection in time series and reression models[J].Statistics Probability Lett,1998,29:1. |
[4] | Yuste, SB .Weighted average finite difference methods for fractional diffusion equations[J].Journal of Computational Physics,2006(1):264-274. |
[5] | Cai Anhui;Sun Guoxiong;Pan Ye .Evaluation of the parameters related to glass-forming ability of bulk metallic glasses[J].Materials & Design,2006,27:479. |
[6] | Sheen JN .Fuzzy evaluation of cogeneration alternatives in a petrochemical industry[J].Computers & Mathematics with Applications: An International Journal,2005(5/6):741-755. |
[7] | Soltani A R;Fernando T .A fuzzy based multi-objective path planning of construction sites[J].Autom Construction,2004,13:717. |
[8] | Avineri E.;Ceder A.;Prashker J. .Transportation projects selection process using fuzzy sets theory[J].Fuzzy sets and systems,2000(1):35-47. |
[9] | Chert C T .Extensions of the TOPSIS for group decision making under environment[J].Fuzzy Sets and Systems,2000,114:1. |
[10] | Olson D L .Comparison of weights in TOPSIS models[J].Mathematical and Comput Modelling,2004,40:721. |
[11] | Opricovic Serafim;Tzeng Gwo Hshiung.Compromise solution by MCDM methods:A comparative analysis of VIKOR and TOPSIS[J].European Journal of Operational Research,2004(156):445. |
[12] | Deng Hepu .Yeh Chunghsing Inter-company comparison using modified TOPSIS with objective weights[J].Comput Operations Res,2000,27(10):963. |
[13] | Lin J L;Lin C L .The use of grey-fuzzy logic on the optimization of the manufacturing process[J].J Mater Techn,2005,160:9. |
[14] | Chiang Kota;Chang Fuping .Application of grey-fuzzy logic on the optimal process design of an injection-molded part with a thin shell feature[J].Int Commun Heat Transfer,2006,33:94. |
[15] | Lin J L;Lin C L .The use of orthogonal array with grey relational analysis to optimize the electrical discharge machining process with multiple performance characteristics[J].International Journal of Machine Tools and Manufacture,2002,42:237. |
[16] | Moran J;Granada E;Mignez J .Use of grey relational analysis to assess and optimize small biomass boilers[J].Fuel Proc Techn,2006,87:123. |
[17] | Lai Hsinhis;Lin Yangeheng;Yeh Chunghsing .Form design of product image using grey relational analysis and neural network models[J].Comput Operations Res,2005,32:2689. |
[18] | Chen Meifang;Tzeng Gwohshiung .Combining grey relation and TOPSIS concepts for selecting an expatriate host country[J].Mathematical and Comput Modelling,2004,40:1473. |
[19] | 杨瑞成;邓文怀;冯辉霞.工程设计中的材料选择与应用[M].北京:化学工业出版社,2004 |
[20] | Mohammed A K .Selecting the appropriate project delivery method using AHP[J].International Journal of Project Management,2002,20:469. |
[21] | Omasa Takeshi;Kishimoto Michimasa;Kawase Masaya et al.An attempt at decision making in tissue engineering:Reactor evaluation using the analytic hierarchy process (AHP)[J].Biochemical Engineering Journal,2004,20:173. |
[22] | Kamal M. Al-Subhi Al-Harbi .Application of the AHP in project management[J].International journal of project management,2001(1):19-27. |
上一张
下一张
上一张
下一张
计量
- 下载量()
- 访问量()
文章评分
- 您的评分:
-
10%
-
20%
-
30%
-
40%
-
50%