For steel-making and continuous/ingot casting are the key processes of modern iron and steel enterprises, this paper proposes a batch splitting schedule policy to solve continuous and ingot casting schedule of mixed whole/ half charging plan for steel making. First establish the model of continuous and ingot casting schedule of mixed whole/half charging plan according to the complex constraints. Then solve this model by heuristic algorithm. Finally use actual data to prove the proposed algorithmrs validity and analyze the application result in steel plant.

参考文献

[1] Zanoni S;Zavanella L .Model and Analysis of Integrated Pro duction-Inventory System:The Case of Steel Production[J].International Journal of Production Economics,2005,93-94(08):197.
[2] Ivan Ferretti;Simone Zanoni;Lucio Zavanella .Production-inventory scheduling using Ant System metaheuristic[J].International journal of production economics,2006(2):317-326.
[3] VIKAS KUMAR;SHASHI KUMAR;M. K. TIWARI;F. T. S. CHAN .Auction-based approach to resolve the scheduling problem in the steel making process[J].International journal of production research,2006(8):1503-1522.
[4] Tang L;Luh PB;Liu J et al.Steel-Making Process Scheduling Using Lagrangian Relaxation[J].International Journal of Production Research,2002,40(01):55.
[5] KANGBOK LEE;SOO Y. CHANG;YUSHIN HONG .Continuous slab caster scheduling and interval graphs[J].Production Planning & Control,2004(5):495-501.
[6] Ouelhadj D;Cowling PI;Petrovic S .Utility and Stability Measures for Agent-Based Dynamic Scheduling of Steel Continuous Casting[D].Nottingham:University of Nottingham,2003.
[7] Stohl K;Spopek W;VAI-Schedex.A Hybrid Expert System for Co-Operative Production Scheduling in Steel Plant[A].Korean Institute of Metals and Materials,1993:207.
[8] Ivan Ferretti;Simone Zanoni;Lucio Zavanella .Production-inventory scheduling using Ant System metaheuristic[J].International journal of production economics,2006(2):317-326.
[9] ZHU Dao-fei,ZHENG Zhong,GAO Xiao-qiang.Intelligent Optimization-Based Production Planning and Simulation Analysis for Steelmaking and Continuous Casting Process[J].钢铁研究学报(英文版),2010(09):19-24,30.