欢迎登录材料期刊网

材料期刊网

高级检索

参考文献

[1] (I).Alp;H.Deveci;E.Y.Yazici;T.Türk Y.H.Süngün .[J].Journal of Hazardous Materials,2009,166:144-149.
[2] C.Jin;D.X.Li .[J].Metal Mine,2011,46(10):162-165.
[3] Y.J.Zheng;Z.C.Liu .[J].Powder Technology,2011,207:335-342.
[4] P.Chen;X.J.Lv;X.Q.Cui .[J].Mining,2008,24(5):71-73,94.
[5] H.J.Xu;D.B.Hu .[J].Metal Mine,2002,37(10):259-261.
[6] D.C.Luo;P.G.Yi;J.F.Liu .[J].Industrial Security and Environmental Protection,2003,29(4):10-12.
[7] N.Tugrul;E.M.Derun;M.Piskin .[J].Powder Technology,2007,176:72-76.
[8] N.Tugrul;E.M.Derun;M.Piskin .[J].Waste Manag.Res,2006,24:446-455.
[9] J.Gong;B.W.Zhang;B.W.Li .[J].China Mining,2010,19(6):64-66,72.
[10] X.S.Wang;C.X.Li;Y.K.Fu .[J].J.Iron Steel Res,2005,17(3):10-14.
[11] J.T.Wei;G.Y.Yan;B.K.Guo;G.L.Gao .[J].J.Cent.South Univ.T,2003,10:27-31.
[12] S.Arakawa;A.Ishimisu .Process of Obtaining a Granular Charge for the Blast Furnace from a Pyrite Cinder and Iron Manufacture Dust or Powdered Iron Ore[P].US,3482964,1969.
[13] B.B.He;X.K.Tian;Y.Sun;C.Yang Y.L.Zeng Y.X.Wang S.X.Zhang Z.B.Pi .[J].HYDROMETALLURGY,2010,104:241-246.
[14] T.J.Chun;D.Q.Zhu;J.Pan .[J].J.Cent.South Univ.T,2011,18:1924-1929.
[15] X.S.Wang;Y.K.Fu .[J].Multipurpose Utilization of Mineral Resources,2005,17(5):10-13.
[16] Z.H.Yuan;W.Luo;P.M.Lv .[J].Chem.Ind.Eng.Prog,2009,28:1687-1694.
[17] F.F.Min;M.X.Zhang .[J].Journal of China Coal Society,2005,30:104-108.
[18] T.C.Ooi;D.Thompson;D.R.Anderson;R.Fisher T.Fray M.Zandi .[J].Combustion and Flame,2011,158:979-987.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%