在碱性铈盐溶液中,通过两步阴极电解方法,成功地在工业纯Al表面生成了Ce转化膜,并开发出TS2/TS7和TS3/TS7两种两步阴极电解成膜工艺.研究表明,经TS2/TS7、TS3/TS7处理的L4工业纯Al在氯化物环境中的耐蚀性得到了显著提高
Cerium conversion film was successfully deposited on industrial pure aluminum in alkaline cerium solution using cathodic electrolysis method with two steps.Two kinds of two-step techniques for the formation of cerium conversion film using cathodic electrolysis method,named as TS2/TS7,TS3/TS7respectively,were discussed.It was noticed that the corrosion resistance of L4 industrial pure aluminum was greatly improved in chloride environment after the treatment of TS2/TS7 and TS3/TS7.
参考文献
[1] | B R W Hinton,D R Amott,N E Ryan.Metal Forum,1984,7(4):211 |
[2] | B R W Hinton,D R Amott,N E Ryan.Materials Forum,1986,9(3):162 |
[3] | 田虹.北京科技大学腐蚀系.硕士学位论文,1997. |
上一张
下一张
上一张
下一张
计量
- 下载量()
- 访问量()
文章评分
- 您的评分:
-
10%
-
20%
-
30%
-
40%
-
50%