针对目前熔融还原设备无法将煤气二次燃烧氧化区与铁氧化物还原区隔离而导致能耗偏高的问题,提出了一种两步三段式厚渣层铁浴熔融还原炼铁工艺,以期利用厚渣层冶炼的方法使得氧化区与还原区的梯度隔离.设计了主反应器铁浴炉尺寸与产能,并建立了工艺的整体静态模型,考察了球团金属化率与铁浴炉炉顶煤气氧化度对工艺煤耗、氧耗以及能耗的影响.在选定的适宜操作参数,即煤气氧化度55%,球团金属化率80%条件下,冶炼1t铁水,消耗球团矿1869.83kg,煤粉674.07kg,同时得到还原度71%的改质煤气898.44kg.结合反应器的设计产能,反应器可处理球团矿3793.66kg/(h·m2).
参考文献
[1] | Meijer K;Zerlstra C;Teerhuis C et al.Developments in alternative ironmaking[J].TRANSACTIONS OF THE INDIAN INSTITUTE OF METALS,2013,66(5/6):475. |
[2] | Yingxia QU;Zongshu ZOU;Yanping XIAO .A Comprehensive Static Model for COREX Process[J].ISIJ International,2012(12):2186-2193. |
[3] | 曲迎霞,王臣,邹宗树,周渝生.COREX工艺静态模型的开发[J].钢铁,2008(04):10-13. |
[4] | Katsunori FUKUI .A Study on the New Iron Ore Smelting Reduction Processes[J].鉄と鋼,1996(1):1-7. |
[5] | Joo S;Kim H G;Lee I O et al.FINEX:a new process for production of hot metal from fine ore and coal[J].Scandinavian Journal of Metallurgy,1999,28(4):178. |
[6] | 张寿荣,张绍贤.韩国浦项钢铁公司FINEX工艺[J].钢铁,2009(05):1-5,38. |
[7] | Noldin Júnior J H;Contrucci M A;D'Abreu J C .Tecnored process-high potential in using different kinds of solid fuels[J].Materials Research,2005,8(4):447. |
[8] | V. Romenets;V. Valavin;Yu. Pokhvisnev;S. Vandariev .Processing industrial wastes with the liquid-phase reduction Romelt process[J].JOM,1999(8):33-37. |
[9] | 邵剑华,张虎成,方觉,安志伟.流化床和竖炉对熔融还原流程煤耗的影响[J].钢铁研究学报,2008(03):5-8. |
[10] | 李慧斌,王华,邱亚丽,胡建杭,李幼灵.富氧顶吹熔融还原冶炼高磷铁矿与钛铁矿配矿的试验研究[J].钢铁,2012(01):19-23,39. |
[11] | LI Hui-bin,WANG Hua,QI Yi-long,HU Jian-hang,LI You-ling.Ilmenite Smelted by Oxygen-Enriched Top-Blown Smelting Reduction[J].钢铁研究学报(英文版),2011(02):7-13. |
[12] | LIU Yan,JIANG Mao-fa,XU Li-xian,WANG De-yong.A Coupling Dynamic Model for Dissolution and Reduction of Chromium Ore in a Smelting Reduction Converter[J].钢铁研究学报:英文版,2012(01):5-10. |
[13] | Du K P;Wu S L;Kou M Y et al.Numerical simulation of liquid iron flow and heat transfer in the hearth of COREX melter gasifier during tapping process[J].Steel Research International,2013,84:1. |
[14] | Guo Y L;Xu W R;Zhu J M et al.The burden structure and its consumption in the melter gasifier of the COREX process[J].Metallurgical and Materials Transactions,2013,44B:1078. |
[15] | Davis Mark P;Dry Rod J;Schwarz M Philip.Flow simulation of the HIsmelt process[A].Melbourne,Australia:CSIRO,2003:305. |
[16] | 项钟庸,银汉.高炉生产效率的评价方法[J].钢铁,2011(09):17-21. |
上一张
下一张
上一张
下一张
计量
- 下载量()
- 访问量()
文章评分
- 您的评分:
-
10%
-
20%
-
30%
-
40%
-
50%