通过采用水模拟和数值模拟分别对中间包不同结构进行全因素试验,研究了双挡坝结构对钢液流动行为的影响,着重探讨了不同类型的双挡坝中间包内钢液的流动状态和速度分布.结果表明:低坝应设置在高坝后,顶端钢液流速将减小29%,降低浇注末期发生卷渣的概率;低坝应与高坝流钢孔同高,钢液的平均停留时间可达到最大稳定值;高低坝距离差为40~160mm时,流体流动状态较稳定,低坝后无漩涡产生.分析认为:中间包入口区和出口附近均为强湍流状态,其他区域均为过渡流状态,入口区利于夹杂物的碰撞长大,应至少保证该区域长度大于中间包长度的1/4,出口区强湍流易产生大夹杂物导致水口堵塞,应控制在出水口附近0.25m的区域内.

参考文献

[1] 包燕平;王建军;曲英.中间包冶金学[M].北京:冶金工业出版社,2001
[2] YUE Qiang,ZOU Zong-shu,HOU Qin-fu,CHEN Zhou.Water Modeling of Swirling Flow Tundish for Steel Continuous Casting[J].钢铁研究学报(英文版),2009(05):17-22.
[3] Mazumdar D;Yamanoglu G;Guthrie R I L .Hydrodynamic Performance of Steelmaking Tundish Systems:a Comparative Study of Three Different Designs[J].STEEL RESEARCH,1997,68(07):293.
[4] A R Alaei,H Edris,E Shirani.Upward Molten Flow for Optimization of Fluid Flow in Continuous Casting Tundish[J].钢铁研究学报(英文版),2010(11):29-33.
[5] 钟良才,郝瑞朝,陶立群,许宁辉.单流板坯连铸中间包结构优化[J].东北大学学报:自然科学版,2012(05):665-668.
[6] 唐海燕;于满;李京社 等.连铸中间包内部结构优化的数理模拟及冶金效果[J].北京科技大学学报,2009,31(z1):38.
[7] Moumtez Bensouici,Ahmed Bellaouar,Kamel Tal-bi.Numerical Investigation of the Fluid Flow in Continuous Casting Tundish Using Analysis of RTD Curves[J].钢铁研究学报(英文版),2009(02):22-29.
[8] 钟良才,张果,鲁碧为,刘锡海.两流T型连铸中间包结构优化[J].东北大学学报:自然科学版,2012(07):983-986.
[9] Yogeshwar SAHAI;Toshihiko EMI .Melt Flow Characterization in Continuous Casting Tundishes[J].ISIJ International,1996(6):667-672.
[10] Song-xia LIU;Xue-min YANG;Lin DU .Hydrodynamic and Mathematical Simulations of Flow Field and Temperature Profile in an Asymmetrical T-type Single-strand Continuous Casting Tundish[J].ISIJ International,2008(12):1712-1721.
[11] Yuji Miki;Brian G. Thomas .Modeling of inclusion removal in a tundish[J].Metallurgical and Materials Transactions, A. Physical Metallurgy and Materials Science,1999(4):639-654.
[12] Anurag TRIPATHI;Satish Kumar AJMANI .Effect of Shape and Flow Control Devices on the Fluid Flow Characteristics in Three Different Industrial Six Strand Billet Caster Tundish[J].ISIJ International,2011(10):1647-1656.
[13] 岳强,邹宗树,陈舟.连铸中间包内夹杂物上浮规律的研究[J].钢铁,2009(02):28-31.
[14] Sinha Asish Kumar;Saha Yogeshwar .Mathematical Modeling of Inclusion Continuous Casting Tundishes Transport and Removal in Continuous Casting Tundishes[J].ISIJ International,1993,33(05):556.
[15] Mazumdar D;Yamanoglu G .Hydrodynamic Performance of Steelmaking Tundish System:a Comparative Study of Three Different Tundish Designs[J].STEEL RESEARCH,1997,68(07):293.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%