通过采用水模拟和数值模拟分别对中间包不同结构进行全因素试验,研究了双挡坝结构对钢液流动行为的影响,着重探讨了不同类型的双挡坝中间包内钢液的流动状态和速度分布.结果表明:低坝应设置在高坝后,顶端钢液流速将减小29%,降低浇注末期发生卷渣的概率;低坝应与高坝流钢孔同高,钢液的平均停留时间可达到最大稳定值;高低坝距离差为40~160mm时,流体流动状态较稳定,低坝后无漩涡产生.分析认为:中间包入口区和出口附近均为强湍流状态,其他区域均为过渡流状态,入口区利于夹杂物的碰撞长大,应至少保证该区域长度大于中间包长度的1/4,出口区强湍流易产生大夹杂物导致水口堵塞,应控制在出水口附近0.25m的区域内.
参考文献
[1] | 包燕平;王建军;曲英.中间包冶金学[M].北京:冶金工业出版社,2001 |
[2] | YUE Qiang,ZOU Zong-shu,HOU Qin-fu,CHEN Zhou.Water Modeling of Swirling Flow Tundish for Steel Continuous Casting[J].钢铁研究学报(英文版),2009(05):17-22. |
[3] | Mazumdar D;Yamanoglu G;Guthrie R I L .Hydrodynamic Performance of Steelmaking Tundish Systems:a Comparative Study of Three Different Designs[J].STEEL RESEARCH,1997,68(07):293. |
[4] | A R Alaei,H Edris,E Shirani.Upward Molten Flow for Optimization of Fluid Flow in Continuous Casting Tundish[J].钢铁研究学报(英文版),2010(11):29-33. |
[5] | 钟良才,郝瑞朝,陶立群,许宁辉.单流板坯连铸中间包结构优化[J].东北大学学报:自然科学版,2012(05):665-668. |
[6] | 唐海燕;于满;李京社 等.连铸中间包内部结构优化的数理模拟及冶金效果[J].北京科技大学学报,2009,31(z1):38. |
[7] | Moumtez Bensouici,Ahmed Bellaouar,Kamel Tal-bi.Numerical Investigation of the Fluid Flow in Continuous Casting Tundish Using Analysis of RTD Curves[J].钢铁研究学报(英文版),2009(02):22-29. |
[8] | 钟良才,张果,鲁碧为,刘锡海.两流T型连铸中间包结构优化[J].东北大学学报:自然科学版,2012(07):983-986. |
[9] | Yogeshwar SAHAI;Toshihiko EMI .Melt Flow Characterization in Continuous Casting Tundishes[J].ISIJ International,1996(6):667-672. |
[10] | Song-xia LIU;Xue-min YANG;Lin DU .Hydrodynamic and Mathematical Simulations of Flow Field and Temperature Profile in an Asymmetrical T-type Single-strand Continuous Casting Tundish[J].ISIJ International,2008(12):1712-1721. |
[11] | Yuji Miki;Brian G. Thomas .Modeling of inclusion removal in a tundish[J].Metallurgical and Materials Transactions, A. Physical Metallurgy and Materials Science,1999(4):639-654. |
[12] | Anurag TRIPATHI;Satish Kumar AJMANI .Effect of Shape and Flow Control Devices on the Fluid Flow Characteristics in Three Different Industrial Six Strand Billet Caster Tundish[J].ISIJ International,2011(10):1647-1656. |
[13] | 岳强,邹宗树,陈舟.连铸中间包内夹杂物上浮规律的研究[J].钢铁,2009(02):28-31. |
[14] | Sinha Asish Kumar;Saha Yogeshwar .Mathematical Modeling of Inclusion Continuous Casting Tundishes Transport and Removal in Continuous Casting Tundishes[J].ISIJ International,1993,33(05):556. |
[15] | Mazumdar D;Yamanoglu G .Hydrodynamic Performance of Steelmaking Tundish System:a Comparative Study of Three Different Tundish Designs[J].STEEL RESEARCH,1997,68(07):293. |
上一张
下一张
上一张
下一张
计量
- 下载量()
- 访问量()
文章评分
- 您的评分:
-
10%
-
20%
-
30%
-
40%
-
50%