排山楼金矿采用分段凿岩阶段矿房采矿法,中深孔崩矿,采矿损失贫化管理十分重要。分析了影响排山楼金矿采矿损失贫化的主要因素,介绍了采场再次圈定,中深孔爆破参数、爆破方式、底部结构、采矿工程优化设计选择,重视和加强现场施工及制度等施工技术管理措施。技术管理措施的实施得到很好的应用效果,降低采矿损失率约3%,矿石贫化率约2%,提高了企业经济效益。

Sublevel caving-staged room and pillar mining method is adopted in Paishanlou Gold Mine.Medium-long hole blasting makes loss and dilution control very important.The paper analyzes influencing factors of loss and di-lution in Paishanlou Gold Mine,and introduces the re-delineation,options for medium-long hole blasting parameters, blasting method,bottom structure and optimization designs of mining engineering,and management measures for on-site construction and system.The implementation of technical management measures achieves satisfactory results,reducing mining loss rate by 3 %and ore dilution rate by 2 %.The profits of the enterprise are improved.

参考文献

[1] 尹向林.采场"二次圈定"工作在矿山地质工作中的应用[J].科技情报开发与经济,2003(06):106-107.
[2] 孙祺年.降低采矿损失率和贫化率的研究与实践[J].采矿技术,2009(03):7-9,18.
[3] 赵强;张建华;李星;冯毓松;李胜利.降低中深孔爆破大块率的技术措施[J].爆破,2011(4):50-52,56.
[4] 王殿成;李红伟;赵立春.金属矿山降低矿石损失和贫化提高回采率的探讨[J].矿产保护与利用,2003(4):8-10.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%