以汤丹铜矿复杂采空区条件下的通风系统为工程背景,介绍了多中段进风和集中回风的机械通风系统及存在的问题;针对通风系统进风段阻力大、进风困难以及采空区未进行有效封闭的状况,开展了压-抽结合二级机站通风系统优化整改,进一步完善了通风系统,收到了很好的通风效果。
The paper takes the ventilation system under complex goaf conditions in Tangdan Copper Mine in Yun -nan as engineering background ,introduces the mechanical ventilation system of multi-stage inlet air and centralized re-turn air and its problems .the high resistance of the downcast section ,the difficulty of inlet air and the ineffective con-finement of goafs facilitate the renovation of press-pump two-stage ventilation system ,which further complete the venti-lation system ,achieving good ventilation effects .
参考文献
[1] | 任甲泽.矿井通风优化及多级机站技术的推广[J].金属矿山,2008(01):148-150. |
[2] | 张国枢;谭允桢;陈开岩.通风安全学[M].徐州:中国矿业大学出版社,2007 |
[3] | 董振民;陶戌伯;周良成 .梅山铁矿多级机站通风回顾和展望[J].中国矿业,1994,3(03):26-30. |
[4] | 董振民.论多级机站通风技术的若干问题[J].矿业快报,2001(12):1-4. |
[5] | 潘军义,董振民.多级机站通风局部阻力的研究[J].金属矿山,2001(09):49-51. |