二段磨矿是黄金炭浸厂生产中的关键环节,不仅影响生产技术指标,同时因其作业高能耗的特点,对选矿控制生产成本也起着至关重要的作用。通过对某金矿炭浸厂二段磨矿过程进行优化实践,取得了良好的效果;这说明在生产中重视磨矿过程技术参数的优化和磨矿过程的精细化操作,对提高炭浸厂的生产能力、节能降耗、降低生产成本、提高企业经济效益具有重要的现实意义。

The two-stage grinding is a key link in gold CIL plant production.It not only affects technical index in production,but also plays a decisive role in cost control of mineral processing production process due to the character-istics of the high energy consumption.Optimization of the two-stage grinding process is carried out on a gold CIL plant in one gold mine,the practice of which has achieved good results.It indicates the importance of attaching great impor-tance to the optimization of grinding process parameters in production.It has important practical significance for impro-ving CIL plant′s production capacity,energy saving,reducing production costs and improving economic efficiency of enterprises.

参考文献

[1] 王俊;张全祯.炭浆法提金工艺与实践[M].北京:冶金工业出版社,2001
[2] 《选矿设计手册》编委会.选矿设计手册[M].北京:冶金工业出版社,1988
[3] 《破碎粉磨机械》编写组.破碎粉磨机械[M].北京:机械工业出版社,1978
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%