研究了九顶山铜钼矿2480 m水平201采场出矿巷道开挖后的二次应力分布及巷道变形机制。首先根据现场工程地质勘查和室内岩石力学试验对巷道围岩进行了岩石力学参数确定;在此基础上运用FLAC3D数值模拟软件研究了巷道开挖后的应力应变状态,分析了围岩变形机制。研究结果表明,围岩条件不同的出矿巷道其二次应力分布影响范围有所差异,但围岩主应力总体上表现为由巷道边墙中下部位的压应力集中带逐步过渡到拱顶、底板一定范围内的拉应力集中带。

The secondary stress distribution and deformation mechanism of excavated ore-drawing roadway of Lev-el 2480,Stope 201 in Jiudingshan copper-molybdenum mine are studied.Firstly,rock mechanical parameters of the wall rocks of tunnel are determined by field engineering geological investigation and indoor rock mechanics experi-ments.The state of stress after the excavation of ore-drawing roadway is simulated by FLAC3D before the wall rock de-formation mechanism is analyzed.The results show that the secondary stress distribution with different wall rock condi-tions differs in distribution ranges;but the principal stress distribution transits from compressive stress centralized in mid and lower part of mining tunnel sidewalls to tensile stress centralized in mining tunnel vault and floor.

参考文献

[1] 袁海平,曹平.我国自然崩落法发展现状与应用展望[J].金属矿山,2004(08):25-28.
[2] 丁家瑞,李佩基,刁淑娟.遥感在矿产资源调查、合理开发规划、管理和保护工作中的应用[J].国土资源遥感,1998(02):12-17.
[3] 靖洪文,李元海,许国安.深埋巷道围岩稳定性分析与控制技术研究[J].岩土力学,2005(06):877-880,888.
[4] 刘君,孔宪京.节理岩体中隧道开挖与支护的数值模拟[J].岩土力学,2007(02):321-326.
[5] 朱凌刚.九顶山铜钼矿床地下开采掘进爆破方式初探[J].采矿技术,2009(01):8-10.
[6] 姜华,邹国富,和晓南.九顶山铜钼多金属矿区岩浆侵入期次和成矿作用[J].金属矿山,2013(04):97-100,105.
[7] 谢本贤,陈沅江,史秀志.深部岩体工程围岩质量评价的IRMR法研究[J].中南大学学报(自然科学版),2007(05):987-992.
[8] 刘波;韩彦辉.Flac 原理、实例与应用指南[M].北京:人民交通出版社,2005
[9] Hock E;Brown E T.Underground excavation in rock[A].London:Institute of Mining and Metallurgy,1980:67-72.
[10] Georci M.On the valuation of strength and resistance condition of the rock in natural rock mass[A].Belgrade:Yugoslavian Science Press,1970:67-72.
[11] <采矿设计手册>编辑委员会.采矿设计手册:井巷工程卷[M].北京:中国建筑工业出版社,1989
[12] 王建宇.隧道工程监测和信息化设计原理[M].北京:中国铁道出版社,1990