河南金渠黄金股份有限公司选矿厂工艺设备陈旧,设备能耗大,处理矿量低。通过对选矿设备的更新、工艺流程的改造及优化,提高了矿石处理量和选矿回收率,降低了生产成本,成效显著。
The outdated facilities in Jinqu Gold Company have the shortcomings of high energy consumption and low processing capacity .Through the update of new mineral processing equipment and the optimization of the process -ing flow,the treatment capacity is improved and the recovery rate of mineral processing is increased ,reducing the pro-duction cost ,achieving remarkable benefits .
参考文献
[1] | 胡为柏.浮选[M].北京:冶金工业出版社,1989 |
[2] | 段希祥.碎矿与磨矿[M].北京:冶金工业出版社,2006:190-194. |
[3] | 舒加强,阮华东.中矿选择性分级再磨工艺在武山铜矿的应用[J].现代矿业,2011(03):85-86,89. |
上一张
下一张
上一张
下一张
计量
- 下载量()
- 访问量()
文章评分
- 您的评分:
-
10%
-
20%
-
30%
-
40%
-
50%