充填接顶是充填采矿法的重要环节,也是充填作业的技术难点。以大冶铁矿东采区由崩落采矿法转为分段空场嗣后胶结充填采矿法所面临的充填接顶技术问题为工程背景,分析了在现场充填中可能影响充填接顶的相关因素,进而有针对性地提出了一系列解决充填接顶问题的技术措施,为指导和改善大冶铁矿充填采场的充填接顶问题提供理论依据及技术支持。

Roof-contacted filling is not only an important part of stoping and filling ,but also a technical difficulty of filling operation .Based on the engineering background of east mining area of Daye iron mine and the problems the mine faces after the transition from sublevel caving to sublevel open stoping and subsequent cemented filling .The pa-per analyzes related factors that may affect roof-contacted filling on site , and then puts forward a series of technical measures to solve the problem of roof-contacted filling effectively .It has provided the theoretical basis and technical support to guide and improve the roof-contacted filling issues of Daye iron mine .

参考文献

[1] 汤丽,肖卫国.采场中充填料浆流动规律的研究[J].矿业研究与开发,2005(02):7-9.
[2] 胡国宏,李夕兵.充填接顶影响因素分析[J].矿业研究与开发,2010(03):20-23.
[3] 刘同友.充填采矿技术与应用[M].北京:冶金工业出版社,2001
[4] 宗海祥.浅议上向进路式充填法的接顶率[J].矿冶,1999(02):1.
[5] 崔栋梁,赵国彦,李夕兵,宫凤强.新城金矿采矿方法和充填接顶工艺探讨[J].金属矿山,2006(03):22-24,76.
[6] 王新民;肖卫国;张钦礼.深井矿山充填理论与技术[M].长沙:中南大学出版社,2005
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%